LBI Logo

LBI Catalogue: 3D Model & Archive

View your project in a fully immersive 3D environment that works seamlessly on both desktop and mobile. Explore panel installation scenarios, and access all related project documents and maintenance information. No software needed. No technical expertise required. Just open and explore.

3D Site Planning and Measurement

Explore panel and rail installation scenarios directly on the photogrammetry-based 3D model. Measure everything live with high accuracy and precision, just like working on a digital model of your site.


Case Study


Services

Custom-designed solar power and electrical solutions for efficient, reliable energy at any scale.
Solar Power Services
High-resolution drone imaging for inspections, surveys, and visual documentation. We deliver precise data and stunning visuals for residential, commercial, and industrial projects.
Drone Imaging
Accurate 3D models of real-world spaces for visualization, inspection, and collaboration on our web-based platform. No software installation required!
Photogrammetry & 3D Modeling

Solar Installation Timeline

1
Customer & LBI
Sign the contract.
2
LBI
Drone imaging & 3D modeling with solar design (2–3 days).
3
LBI
Design project & submit to HEP ODS (15–30 days).
4
LBI
Receive notification on connection feasibility (30 days).
5
LBI
Install solar plant & request permanent operation (1–3 days).
6
LBI
Receive confirmation of permanent operation (30 days).
7
LBI
Activate solar power plant (within 48 hours).
8
LBI
Solar power plant fully operational.

Frequently Asked Questions

What factors influence the solar potential of a residential solar power system?

The solar potential of every home system is unique and depends on several key factors. These include the home's geographic location, the number of sunny days in the area, and the size, type, and orientation of the roof. For tailored advice on determining the ideal capacity of your solar power system—ensuring it meets your household’s energy needs—along with installation and financing options, feel free to consult our team of experts.

Who installs a home solar power system and how long does the installation take?

The installation is carried out by our certified technicians. The process typically takes between one and two days, depending on the system’s size, the type of roof, and the materials used in the roof structure.

Is it possible to install a home solar power system on an apartment building?

Yes, installing a solar power system on a residential building is possible. However, it requires the approval of all co-owners or residents of the building before installation can proceed.

What is the return on investment for a home solar power system?

Solar energy is not only environmentally friendly but also financially rewarding in the long run. For an average family home in Croatia, the return on investment is typically expected within 6 to 8 years. After this period, the solar system begins to generate profit for its owner. It’s important to note that rising electricity prices can potentially shorten this payback time.

Is the web-based 3D model and measurement accurate?

Yes, the 3D model generated through photogrammetry is highly accurate, with an average error of approximately 1%—around 5 cm over a 5-meter span. Panel layouts and mounting structures are also integrated into the model prior to installation, enabling thorough review and validation before the actual setup.